Category: Great-Britain

  • Reopening of Southend Cliff Lift

    At last, the Southend Cliff Lift has reopened on Tuesday 25th May 2010!
    It reopened with a new carriage, a new tracks, a new winding gear and electrical and control systems.
    The Cliff Lift was originally opened for the first time on August Bank Holiday Monday 1912. The Lift replaced one of the first examples of a moving walkway in the country that was installed in 1901, Although a radical and innovative idea it proved to be noisy, uncomfortable and unreliable.
    The Cliff Lift is a true counter-balanced funicular railway, the counter-weight ingeniously located under the carriage running on a separate track. The Lift was constructed by Waygood and Co. and was an immediate success.
    In 1990 further improvements were carried out including a third new carriage with side mounted door and new access ramps that improved access for pushchairs and the disabled. In 2003 a malfunction with the counter-weight brought operations to a halt and the Cliff Lift was out of action for a period of 7 years. Investigations revealed major corrosion to the structure that would take some time and money to correct.
    In the meantime Southend-on-Sea Borough Council received funding from the Heritage Lottery Fund to restore the Cliff Gardens including the Lift stations. The work on the stations including new roofs and decorative ironwork was completed in 2006.

    Réouverture du Southend Cliff Lift

    Le funiculaire Southend Cliff Lift a finalement été enfin remis en service le mardi 25 mai 2010!
    L’unique voiture a été changée ainsi que la voie, les poulies et les systèmes de contrôles électriques.
    Le funiculaire avait été mis en service pour la première fois en août 1912. Il avait remplacé un des premiers systèmes d’escalier mécanique du pays qui avait été mis en service en 1901 bien que très innovant mais qui été finalement très bruyant, inconfortable et peu sûr.
    Le nouveau funiculaire est un vrai système à contrepoids, celui-ci se déplace sur une voie spéciale située sous la voie de la voiture. Le système avait été conçu par Waygood and Co. et fut un succès immédiat.
    En 1990 la voiture fut changée pour la troisième fois avec l’ajout d’une porte latérale et l’accessibilité aux fauteuils roulants. En 2003 un problème sur le contrepoids obligea à arrêter l’exploitation du funiculaire. Des examens révélèrent de gros problèmes de corrosion au niveau de la structure qui nécessitèrent du temps et de l’argent pour être réparés au bout de 7 années. Entre temps la municipalité de Southend-on-Sea récolta des fonds de l’Heritage Lottery Fund pour restaurer les jardins et le funiculaire. Les deux stations ont été restaurées en 2006.

    jlkjklj
    Cliff Lift in action / Le funiculaire en service
    The track and the lower station / La voie et la gare basse
    The counterweight / Le contrepoids
    Pier Hill Lifts
    Pier train / Le train de la jetée
    Pier train / Le train de la jetée

    Photos Dave Carson

    Map

    A – Southend Cliff Lift
    B – Pier Hill Lifts
    C – Pier train

  • Hastings East Hill – The modernization

    Good news… at HASTINGS, the EAST HILL Cliff Railway is stopped for a complete modernization.
    The two carriages are being replaced but the chassis are being retained and overhauled. The track is being cleared of weeds etc. The control panel is being replaced.
    The Reopening will be in the New Year 2010.
    LECS (UK) LTD
    is doing this modernization as it already did the Babbacombe Cliff Lift modernization in 2005.
    The next modernization of LECS (UK) LTD :
    HASTINGS WEST Cliff Lift
    The control panels are being replaced. Project starts in March 2010
    SOUTHEND Cliff Lift
    The structure has been overhauled and the new track is being installed at the end of November. A new carriage on the existing chassis has been built and the control panel will be replaced.
    LIZARD Cliff Lift:
    A new carriage is being installed on the original chassis and again the control panel is being replaced along with a complete new motor and gearbox.
    Project starts in March 2010.

    HASTINGS EAST HILL – La modernisation

    Bonne nouvelle… à HASTINGS, le funiculaire EAST HILL vient d’être arrêté pour une rénovation complète.
    Les deux voitures vont être remplacées mais les châssis vont être conservés après rénovation. Les voies vont être nettoyées. Le panneau de contrôle va être remplacé.
    La réouverture est prévue pour la nouvelle année 2010.
    C’est LECS (UK) LTD qui est en charge de cette modernisation comme elle avait déjà fait celle de Babbacombe Cliff Lift en 2005.
    Les prochaines modernisations de LECS (UK) LTD :
    HASTINGS WEST Cliff Lift
    Le panneau de contrôle va être remplacé. Début du projet en mars 2010.
    SOUTHEND Cliff Lift
    Les structures vont être révisées et une nouvelle voie va être installée à la fin novembre 2009. Une nouvelle voiture va  être installée sur le châssis existant et le panneau de contrôle va être remplacé.
    LIZARD Cliff Lift:
    Une nouvelle voiture va être installée sur le châssis d’origine et le le panneau de contrôle va être remplacé. Un nouveau moteur et une nouvelle boîte de vitesses vont être installés.

    20091119-001
    Hastings, the East Hill Cliff Railway

     

    20091119-002
    Hastings, the East Hill Cliff Railway

     

    20091119-003
    Hastings, the East Hill Cliff Railway

     

    20091119-004
    Hastings, the East Hill Cliff Railway

    ( Photos David Cooper, LECS (UK) Ltd )

    The carriages are being replaced but the chassis are being retained and overhauled. The track is being cleared of weeds etc. The control panel is being replaced. Reopens in the New Year.
  • Folkestone – The end of the Leas Cliff Lift !

    After the St Nicolas Cliff Lift in Scarborough, it is now the turn of the Leas Cliff Lift in Folkestone to be closed by the local council because of it coast!
    Leas Cliff Lift was opened in 1885. It was a water powered funicular and was the last remaining Cliff Lift of Folkestone…
    As for the Babbacombe Cliff Lift, we may hope that an historic private society will be created to save and restore one of the most famous Cliff Lift of Great Britain!

    Folkestone – La fin du Leas Cliff Lift !

    Tout comme le funiculaire de St Nicolas à Scarborough, c’est maintenant le tour du funiculaire Leas Cliff Lift de Folkestone d’être définitivement fermé par les autorités locales pour cause de coûts trop élévés!
    Le funiculaire Leas Cliff Lift entra en service en 1885 et c’était un système à contre poids d’eau. C’était le dernier funiculaire de Folkestone encore en service.
    Comme pour le funiculaire de Babbacombe, on peut espérer qu’une société historique privée se créera pour sauver et restaurer un des plus célèbres funiculaires de Grande Bretagne!

     

  • Southend-on-Sea – The Cliff Lift being replaced

    The Southend-on-Sea Borough Council finally decided to repair the cliff lift and to replace the old car by a new one to comply with the Disability Discrimination act.
    The main carriageway supporting the 4ft 6in gauge track and 1ft 9in gauge counterbalance track is covered in scaffolding and the entire structure is being repaired with track to be replaced.

    Good news! Hope that Southend will be an exemple to save the St Nicholas Cliff Lift at Scarborought!

    Southend-on-Sea – L’ascenseur est en cours de remplacement

    La municipalité de Southend-on-Sea a finalement décidé de remettre en service l’ascenseur mais en remplaçant la cabine par une nouvelle afin de respecter la charte sur l’accessibilité des transports aux personnes à mobilité réduite.
    La voie est actuellement recouverte par une bâche pour cacher les travaux de remplacement de la voie.

    Bonne nouvelle! Espérons que Southend soit un exemple pour sauver le funi de St Nicolas à Scarborought!

    southend-01

    Southend Pier

    After the fire of October 2005, the work is progressing at the Southend Pier.
    Après l’incendie d’octobre 2005, les travaux sont en cours afin de reconstruire l’extrémité de la jetée.

    southend-05

    Photos Dave Carson

  • Dog Day Afternoon at Babbacombe

    Un 'Après midi de chien' à Babbacombe

    Sun April 27 – Dog Day – The last day that Dogs are allowed on all beaches around Torbay. The final opportunity to give your best friend a run around Oddicombe beach before it is closed to dogs for the summer! 10am – 6pm

    Dimanche 27 avril – Le jour du chien – C'est le dernier jour où les chiens sont autorisés sur les plages autour de Torbay. La dernière opportunité d'offrir à votre meilleur ami une balade sur la plage d'Oddicombe avant qu'elle ne soit interdite aux chiens pour l'été! De 10h à 18h 

    The Friends of Babbacombe Cliff Railway (FBCR) are  organising dog races at low tide during the afternoon!

    Les Amis du Babbacombe Cliff Railway (FBCR) organisent des courses de chiens, à marée basse, durant l'après midi de cette journée du chien!

    Follow this tag for Babbacombe Cliff Railway in Funimag.
    Suivre ce tag pour Babbacombe Cliff Railway dans Funimag.