A
2 meters gauge funicular ! |
|
|
|
The
entrance of the bottom station at Day Lodge (610 m) |
|
|
|
|
|
|
|
|
|
Day
Lodge station, the platform for boarding |
|
|
|
|
|
|
|
|
|
Day
Lodge station at the Ski Center |
|
|
|
|
|
|
|
|
|
Day
Lodge station, the car park, Loch Morlich |
|
|
|
|
|
|
|
|
|
Snow
on Cairn Gorm, the highest point is on the left. |
|
|
|
|
|
|
Click on the thumbnails to enlarge
|
|
|
|
|
|
|
Sheiling
(760 m)
Note that the carriage is stopped exactly at the Sheiling
station just before the passing loop. |
|
|
|
|
|
|
|
|
|
The
two carriages on the tortuous track.
Note the track which is 100% built on concrete stilts.
On the right of the track, the ski trails separated by wooden
fences to protect the snow from the wind. |
|
|
|
|
|
|
|
|
|
Sheiling
station
The employee is spreading green Seed Aide granules on the
ground.
Seed Aide is spread on the areas which where moved by the
construction of the funicular as the trench of the tunnel. |
|
Seed
Aide: Granules, Significantly Improves Seed Germination
& Reduces Soil Erosion, Reduces water runoff, Holds
seed in place, 100% weed free and chemical free. Biodegrades,
no clean up required. Higher percentage of germinating seed.
Contains no seed! Combines cellulose and wood fiber mulch. |
|
|
|
|
|
|
|
|
|
Cairn
Gorm summit (1245 m) without clouds! |
|
|
|
|
|
|
|
|
|
The
250 meters long tunnel at Ptarmigan.
In fact, the tunnel is a covered trench. |
|
|
|
|
|
|
|
|
|
Inside
of Ptarmigan station.
Note the blue steps on the left, this is the Shop and Exhibition
stop. Summer terminus! |
|
|
|
|
|
|
|
|
|
|