Funicular Amsteg power plant in use again since 2003

Work on funicular before reopening / Travaux sur le funiculaire avant sa réouverture
Work on funicular before reopening / Travaux sur le funiculaire avant sa réouverture (Photo 20Minuten-Nicole Agostini)
Where the road collapsed / Où la route s'est effondrée
Where the road collapsed / Où la route s’est effondrée

On 6 March 2017, the Amsteg – Bristen road collapsed at practically the same location where a rock was dynamited in April 2003.
The road has to be repaired and secured which will certainly take several weeks.
The village of Bristen is thus completely isolated. As in 2003, the only connections between Bristen and the valley are the trails and the helicopter.
The former funicular of Amsteg power station will therefore resume service to bring people into the valley.
In 2003, Garaventa had completely renovated and equipped the 1918 funicular to carry passengers.
After the reopening of the road in mid-June 2003, the funicular was finally stopped.
This year the funicular will be awakened, checked and restarted from 15 March 2017 until the Amsteg – Bristen road is reopened again.

Link to Funimag article about 2003

Le funiculaire de la centrale électrique d’Amsteg va reprendre du service

Le 6 mars 2017, la route Amsteg – Bristen s’est effondrée pratiquement au même endroit où un rocher avait été dynamité en avril 2003.
La route doit être réparée et sécurisée ce qui va prendre certainement plusieurs semaines.
Le village de Bristen se retrouve donc complètement isolé. Comme en 2003, les seules liaisons avec Bristen sont les sentiers pédestres et l’hélicoptère.
L’ancien funiculaire de la centrale électrique d’Amsteg va donc reprendre du service pour amener les personnes dans la vallée.
En 2003, Garaventa avait complètement rénové et aménagé le funiculaire, qui datait de 1918, pour pouvoir transporter des passagers.
Après la réouverture de la route mi juin 2003, le funiculaire avec été arrêté définitivement.
Cette année, le funiculaire va donc être réveillé, vérifié et remis en service à partir du 15 mars 2017 jusqu’à ce que la route Amsteg – Bristen soit de nouveau ré-ouverte.

Lien vers l’article Funimag de 2003

Save

Gotthard Base Tunnel – 782 days until opening

Gotthard Base Tunnel – Today, 782 days until opening

Tunnel de base du Saint-Gothard – Aujourd’hui, encore 782 jours avant l’ouverture.

Official website

 

Old photos of Furka – Oberalp (1980)

On my web site of the Furka Cogwheel Steam Railway (DFB), a new page devoted to some old pictures of the Furka Oberalp (FO) circulating on the section Oberwald – Gletsch – Realp in 1980, a few years before the digging of the Furka tunnel and  the abandonment of this section. Follow the link below:

Anciennes photos du Furka – Oberalp (1980)

Sur mon site de la Ligne Sommitale de la Furka (DFB), une nouvelle page consacrée à des anciennes photos du Furka Oberalp circulant sur le tronçon Oberwald – Gletsch – Realp en 1980, c’est à dire quelques années avant le percement du tunnel de la Furka et donc de l’abandon de ce tronçon. Suivre le lien ci-dessous:

 

Old photos of Furka – Oberalp (1980)

Cliquez sur l'image / click on the photo
Cliquez sur l'image / click on the photo

 

Gotthard Base Tunnel – The breakthrough!

That’s it! Today October 15, 2010 at 2pm, the Gotthard Base Tunnel is bored and becomes the longest railway tunnel in the world with 57 kilometers under the whole Gotthard massif.
Tunnel construction began in 1993 but it was not until 2017 that it will finally be completed to pass the first trains to link Zurich to Milan by one hour less than today.
However we must not forget that the AlpTransit project also include the drilling of two other tunnels, Ceneri Tunnel between Bellinzona and Lugano, and Zimmerberg Tunnel between Zurich and Zug.

Le tunnel de base du Saint Gothard – Le percement!

Ça y est! Depuis aujourd’hui 15 octobre 2010 à 14:00, le tunnel de base du Saint Gothard est percé et devient le plus long tunnel ferroviaire du monde avec 57 kilomètres sous la totalité du massif alpin du Gothard.
Le percement du tunnel avait commencé en 1993 mais ce n’est qu’en 2017 qu’il sera enfin terminé pour laisser passer les premiers trains qui permettrons de relier Zürich à Milan en une heure de moins qu’actuellement.
Toutefois il ne faut pas oublier que le projet AlpTransit comprendre également le percement de deux autres tunnels: le tunnel de Ceneri, entre Lugano et Bellinzona, et le tunnel du Zimmerberg, entre Zürich et Zug.



“Sissi” le Tunnelier / “Sissi” the Tunnel Boring Machine

Gotthard Base Tunnel – Only 10 meters left

Today there are only 10 meters left to dig into what will be the longest railway tunnel in the world with 57 km.
Recall that the tunnel will connect the canton of Uri to the canton of Ticino, passing under the totality of the Gotthard massif.
The final drilling is planned for October 15, 2010 if all goes well between now and then.
A special website has been created for this event “Weltrekord Am Gotthard” (World Record at the Gotthard).

Tunnel de base du Gothard – Plus que 10 mètres

Aujourd’hui, il ne reste plus que 10 mètres à creuser dans ce qui sera le plus long tunnel ferroviaire du monde avec 57 kilomètres.
Rappelons que ce tunnel reliera le canton d’Uri au canton du Tessin en passant sous la totalité du massif du Saint-Gothard.
Le percement final est prévu pour le 15 octobre 2010 si tout se passe bien d’ici là.
Un site web spécial a été créé pour cet évènement “Weltrekord Am Gotthard” (Record du monde au Gothard).

Only 10 meters left / Plus que 10 mètres
Only 10 meters left / Plus que 10 mètres

Site officiel du Tunnel de base du Gothard / Official website of the Gotthard Base Tunnel